
- The cost of a SaaS MVP is decided by workflows, roles, billing, and integrations, not by a page count.
- Cutting scope to one core workflow is the fastest way to lower the quote without lowering value.
- Connect proven services for email, payments, and sign-in instead of building them.
Founders often ask for a number before they can describe the product. We do not publish prices, because a SaaS MVP is priced from its scope, and two products with the same idea can have very different scopes. What we can do is show you exactly what moves the quote, so you can shape the first version yourself.
What an MVP is, and is not
An MVP is the smallest version of your product that lets real customers complete the one job it promises, and lets you learn whether they will pay for it. It is not a demo, and it is not a stripped-down copy of the final product. It has to be reliable enough to put in front of paying users.
What is usually inside a SaaS MVP
- Accounts and sign-in: sign-up, login, password reset, and at least a basic role (owner and member).
- The core workflow: the single flow that solves the customer's problem, end to end.
- Multi-tenancy: each customer company sees only its own data.
- Billing: one or two plans, a trial, and a way to collect payment.
- A basic admin side: to see accounts, users, and payments.
- Email notifications: the few messages the workflow depends on.
- Deployment: a live, secured environment with backups.
The cost drivers
These are the things we look at when we build a quote. Each one can be small or large depending on your answer.
1. How many distinct workflows
One workflow, such as “create a booking page and receive bookings”, is a different project from five. Count the verbs your user performs. Every extra one adds design, building, and testing.
2. Roles and permissions
“Owner and member” is simple. “Owner, manager, accountant, and client, each seeing different fields” is a permissions system, and it touches every screen.
3. Billing model
A flat monthly plan is simpler than per-seat pricing, usage-based pricing, or invoices with tax rules. Local payment gateways may need their own handling.
4. Integrations
Email, SMS, WhatsApp, maps, calendars, accounting tools, or a customer’s existing system. Each integration has its own rules, its own failure cases, and its own testing.
5. Data you must import
If customers arrive with spreadsheets or data from another tool, an import feature and its error handling is real work.
6. Languages and design
Arabic with proper right-to-left layouts, or three languages, must be planned from day one. Starting from an existing brand and design file is faster than designing from nothing.
7. Compliance and data location
Some customers need specific hosting regions, audit trails, or exports. Ask early; it is cheap to plan and costly to retrofit.
How to scope an MVP down
- Write the one-sentence problem. If you need two sentences, you may have two products.
- Draw the single path from sign-up to the moment the customer gets value. Everything off that path goes on a “not now” list.
- Replace custom with proven. Use standard sign-in, a payment provider, and managed email instead of building them.
- Do things by hand first. If an admin report can be a manual task for your first ten customers, do not build it yet.
- Fix the launch date, flex the features. Decide what you cut if time runs short, before it does.
A practical example
Imagine a booking tool for small clinics. The MVP: a clinic signs up, creates a public booking page, shares the link, and receives bookings by email. Left for later: patient records, insurance, multi-branch reports, a mobile app, and a custom analytics screen. That first version is a product a clinic can pay for. Each deferred item can be added once real clinics ask for it.
How a quote is built
At Odelyo, we ask for a short brief, send questions back, and then write the scope down. You receive a written scope and a fixed quote, not an hourly estimate. Payment is split into three milestones, so you are never paying for work you have not seen. After launch there is a 30-day bug-fix warranty, and you own the source code and receive a full handover.
Questions to bring to any developer
- Which features are in the quote, and which are explicitly out?
- What happens if I want to change something mid-build?
- Who owns the code and the accounts at the end?
- What is included after launch, and for how long?
What makes an MVP quote grow
Most growth comes from decisions made after the quote, not before it. The usual causes are worth knowing so you can avoid them.
- Scope drift: “just one more report” repeated ten times is a new product.
- Late decisions: changing the billing model or the roles after screens are built means rework.
- Missing content and approvals: logos, texts, legal pages, and account access that arrive late stretch the timeline.
- Unclear ownership of decisions: if three people must approve every screen, the work slows down. Name one decision-maker.
Build, buy, or connect
For every feature, ask whether it must be built custom, bought as a service, or simply connected. Email delivery, payments, file storage, and sign-in are almost always better connected than built. Your own time is best spent on the part that makes your product different. This one question often removes the largest part of a first quote without touching the product’s value.
Related reading
See a related case study: Beno CRM. Our own SaaS product, built around sales, customers, projects, and invoicing in one place. It shows how a multi-module product is organised.
Service page: SaaS development.
Have a SaaS idea and want to know what version one should include?
Tell us what it does and who it is for. Send a brief · WhatsApp us. You get a first reply within one business day.


